The Las Vegas Convention Center project was broken into multiple scopes, including, but not limited to, 10,500 square feet of 80mil PVC and 10,800 square feet of coating over the existing TPO
Project Location:
Las Vegas, Nevada
Las Vegas DivisionLow SlopeNew Construction
St. Jude’s Ranch Healing Center
Installation of a single-ply PVC 060mil roofing system on St. Jude’s Ranch Healing Center
Project Location:
Boulder City, Nevada
EducationLas Vegas Division
Ruby S. Thomas Elementary School
PVC membrane roofing system installed on Ruby S. Thomas Elementary School
Project Location:
Las Vegas, Nevada
Las Vegas DivisionLow SlopeNew Construction
Raiders Way Industrial
Single-ply TPO roof system installed on new construction
Project Location:
Henderson, Nevada
Las Vegas DivisionLow SlopeMunicipalNew Construction
Mesquite Fire Station No. 1
Installation of PVC single-ply membrane roof system to the new Mesquite Fire Station No. 1
Location:
Mesquite, Nevada
Las Vegas DivisionLow Slope
Findlay Honda
Installation of 60mil TPO on the Findlay Honda Northwest Detail Building.
Project Location:
Las Vegas, Nevada
Coating RestorationLas Vegas DivisionLow Slope
St. Rose Cancer Center
Fluid applied restoration of the current BUR with tan coating.
Las Vegas DivisionNew Construction
T-Mobile
Installation of single ply 60mil PVC roof system on new construction building.
Las Vegas DivisionLow SlopeReplacement
Walmart #3356
Tear off of old system and installation of 60mil TPO at Walmart #3356 in Las Vegas, Nevada
Las Vegas DivisionLow SlopeNew Construction
Enterprise on Warm Springs
Installed fully adhered PVC roof system with flashings and roof system components on new construction of an Enterprise building on Warm Springs Rd. and Haven St., Las Vegas.
Coating RestorationErie DivisionIndustrial
Erie Insurance
Restoring the coat on the skylight roof at Erie Insurance headquarters in Erie, Pennsylvania.
Dunkirk DivisionHospitalityReplacement
97 Forest Avenue, Jamestown, New York
We removed all the slate, conducted a full deck replacement, then reinstalled the slate. The existing finial was not worth repairing. We purchased this one, modified it and installed it.